$3,739of $342,576
Phase I (12 months, $342K) to simulate and design SINE, a surface scintillator array to tag muons from LHC forward neutrinos, framed as a receiver for through-Earth neutrino communication. Fits the DoubleZero latency mission with strong team, open-source tools, and clear deliverables, but projected rate (~0.1 bits/s) matches the 2012 Fermilab demo and no transmitter/modulation path is defined.